Kenilworth School and Sixth Form
We have undertaken various maintenance works at Kenilworth School and Sixth Form since 2006. These works have included various flooring jobs to the lower and higher school, refurbishing toilets, redecorating the sports hall and school areas, roof repairs and replacements, replacing doors and windows, erecting external fencing and trellises, repairing the gym floor and installing a high level of internal guttering, ceiling works, general maintenance and decoration.
Ash Green School
We’ve carried out various maintenance activities for Ash Green School including security enhancements, floor repairs, external works and DDA access enhancements and maintenance repairs.
We’ve refurbished Post 16 Block, provided benching and a door for the gym, carried out electrical work, gutter clearances, roof inspections, drainage clearances, drainage repairs, roof and fascia repair works and paving repairs. We’ve also modified window security bars to the IT classrooms, removed a glazed partition to the dining room, repaired a sloping suspended ceiling and repaired boundary fences.
Bishops Tachbrook C of E Primary School
We’ve completed numerous works for Bishops Tachbrook School, including constructing a new single storey classroom, toilets and covered play areas, as well as refurbishing two classrooms to a DDA compliant standard with bespoke acoustic systems, installing new doors and windows, refurbishing toilets, laying new flooring, repairing brickwork, adding new shelving and wall units, along with various extensions and alterations to the nursery, classrooms and staff room.
Pitcheroak School
We have carried out maintenance activities for Pitcheroak School for a number of years, such as replacing floor coverings to an electrical cupboard, replacing the sixth form shower, replacing the hand dryer in the boys toilet, replacing two pairs of hall doors, repairing a leaking water heater, undertaking canopy roof works, replacing the main front door and other general maintenance works.
Stratford upon Avon College
We’ve undertaken various maintenance works at Stratford upon Avon College, including bimonthly grease trap maintenance, renewing floor coverings to the Garden Room, external power and voice wiring the Crown Building, carrying out electrical works and alterations to 1st floor office, repairing a clad damaged glazed wall panel, supplying and fitting a new digital lock, installing partitions and other maintenance works required throughout the campus.
Telford Junior School (see case study)
We have carried out numerous maintenance works to Telford Junior School including laying classroom and entrance lobby flooring, internal and external decorations to the hall, caretakers store, various classrooms and lobby, plus installing new toilets and external hard and soft landscaping.
We have also refurbished an unused swimming pool area and converted it into two new classrooms. We also provided a new link with a canopy and a new access area from the existing building. The work involved considerable demolition works, new screed and flooring, new insulation, rendering, carpeting, plumbing, mechanical and electrical works, comms systems, installing partition walling, new windows and doors, a new suspended ceiling, new kitchen fittings and sink and creating new doorways. We also carried out external works including drainage, fencing, ramps, surfacing and new canopy installation. All works were completed within a tight timescale as they needed to be completed before the summer term began.
The Blue Coat School
There have been various internal and external maintenance activities carried out by our staff, including the ground keepers store, canteen and office works, internal works to main school building, redecorating the main school kitchen, refurbishing the former bursar’s house, refurbishing the ground keepers office and store.
Welcombe Hills School
We’ve undertaken various maintenance, refurbishment and construction works for Welcombe Hills School over a long period of time. Works has included various maintenance items such as flooring, doors, roofing, electrical, decoration and specific activities in the hydrotherapy pool and sensory rooms. Other works have included minor works to the Red Hygiene room and Pear classroom, reconfiguring two offices, soft and hard landscaping, refurbishing the nursery building, an extension to the school reception area and toilet refurbishments.
For more information about our work in schools, please take a look at our school building construction page.
Project:
Maintenance to numerous schools across the MIdlands
Client:
Various
Arden Construction – providing school maintenance services in Warwickshire and the Midlands since 1992